All insights

Data centers · October 2026

Five things that change when a data center is built for AI

The traditional data center was designed around rows of general-purpose servers. Facilities built for AI are organised around accelerators, and that changes what goes into the building.

1. Accelerators set the power density

GPU and AI-chip clusters are replacing CPU-only server rows. The result is more power per rack and more heat per square metre, which drives decisions about electrical distribution and cooling.

2. The network becomes as important as the compute

Links are moving from 10 and 100 Gbps toward 400 Gbps, 800 Gbps and beyond, with more optical interconnects. That means more fiber, more transceivers, and more attention to bend radius, cleanliness and labelling.

3. Liquid cooling arrives

Air cooling alone is no longer enough for dense AI hardware. Direct-to-chip and immersion cooling use pumps, coolant distribution units, heat exchangers, pipes and leak detection. These parts need regular inspection and replacement, which creates recurring maintenance demand.

4. Modular construction speeds expansion

Instead of one large building, operators increasingly add prefabricated modules as demand grows. This favours suppliers who can ship standard kits and repeat them from one module to the next.

5. Energy and edge sites move closer together

Operators are pairing facilities with solar, wind and battery storage, and placing smaller edge sites near users for low-latency work. Edge sites often sit outdoors, so weatherproof cabinets, thermal management and remote monitoring become part of the data center supply chain.

What it means for buyers

The consumables and maintenance items in the list of parts are less glamorous than the GPUs, but they decide uptime: power distribution, batteries, filters, fans, sensors, fiber patch cords, labels and cable ties. Facilities that plan these purchases early avoid delays when a module goes live.

Planning a project?

Send us the details and we will reply within two working days.